Font size:

  • А
  • А
  • А

The color of the site:

  • C
  • C
  • C
Main page News room News

Orenburgneft Sets Power Generation Centre at Garshinskoye Field

Specialists of Orenburgneft, a part of Rosneft, finished the creation of the power generation centre at Garshinskoye field. 47 kilometres of overhead lines were set and 5 substations with a capacity of 110 kV were modernised during the centre construction. The total installed capacity of the substations is over 100 MVA. Commissioning of the facilities allows increasing the production capacity up to 1,000 tonnes per year at the field.

Improvement of the Company’s production asset efficiency is one of the key components of the Rosneft-2022 Strategy. The Company carries out consistent work aimed at sustainable utilization of resources and reduction of energy consumption, optimization of electrical loads and thermal processes in accordance with the requirements of international standard ISO 50001 «Energy Management System».

Garshinskoye field is one of the largest Orenburgneft assets; over 160 oil wells were drilled and 23.2 million tonnes of oil produced here in the entire history.

Note for Editors:

Orenburgneft, a subsidiary of Rosneft Oil Company, is engaged in exploration campaigns at 33 license areas located in Orenburg, Samara and Saratov regions. The enterprise’s operations include 181 license areas and 174 fields. Since the start of commercial operation in 1937, the accumulated production at Orenburgneft’s fields has exceeded 630 million tonnes of oil.

Rosneft
Information Division
November 16, 2020